Two "Giruno" highspeed trains RABe 501 # 004 and # 001 are racing towards the Gotthard Base Tunnel at Rynächt with 160 km/h, in the tunnel they will reach 200 km/h on this pantograph te... (more)
Test run of two "Girunos" highspeed trains RABe 501 # 004 and # 001 are passing the CER Sud (Centro d'Esercizio Regionale/Regional operation center) at Pollegio, near the south portal of... (more)
At 200 km/h (150 mph) the two "Girunos" RABe 501 004 and 001 rush into the 57 kilometer (35,5 miles) long Gotthard Base Tunnel (GBT) at the south portal near Pollegio. The pantograph tes... (more)